City Canceled Planned Lake Austin Drawdown
The 10-foot reduction originally set for this fall has been scrapped following concerns about the local economy.
Updated on Sept. 24, 2026 in Remote Work

Live Poll
Should the city prioritize local business operations over planned infrastructure maintenance on public waterways?
Property owners and businesses expecting a lower Lake Austin this fall will keep their water levels as the City of Austin has officially canceled the planned drawdown. The city moved to scrap the project after feedback regarding the impact on fall events and new guidance from regional power authorities.
Why it matters
The decision preserves the lake level for the local economy and fall events, avoiding the disruption a 10-foot drop would have caused for waterfront access and activity. The city is currently navigating the balance between necessary infrastructure maintenance and the reliability of the regional power grid.
The city canceled a 10-foot drawdown previously set for late 2026. Staff are now evaluating potential future dates after regional officials advised against winter lowering to maintain hydroelectric grid reliability.
The players
Austin Water
The city department responsible for water management and utility services.
Austin Watershed Protection
The city department managing flood control and water quality projects.
Lower Colorado River Authority
The regional entity that manages the Highland Lakes and provides hydroelectric power.
The details
Austin Water and the Watershed Protection department issued a joint memo confirming the cancellation of the drawdown originally scheduled from October 12 through November 30. The city coordinated with the Lower Colorado River Authority to address concerns about grid reliability following previous advisories against winter drawdowns. While the city has begun addressing refund requests for property maintenance permits linked to the project, officials are now assessing how to approach lake management for future seasons.
Timeline
2021: Winter Storm Uri occurred.
September 18, 2026: Date of previous video coverage regarding the project.
October 12 to November 30, 2026: Original dates for the canceled drawdown.
December 1, 2026 to January 15, 2027: Alternative dates proposed by the LCRA.
The Texas Context
This decision follows a shift in regional policy initiated after the 2021 Winter Storm Uri. The city is aligning its local infrastructure maintenance with regional mandates to protect grid stability during winter months.
Property owners who secured maintenance permits should contact the city regarding the refund process following the project cancellation. Residents can expect consistent lake levels through the remainder of the year instead of the previously planned 10-foot reduction.
The takeaway
The lake level will remain stable for the upcoming season, sparing waterfront businesses from significant disruption. Keep an eye on future city memos for any new plans regarding maintenance schedules or potential rescheduling.
Further reading
Find more updates on city infrastructure and utility operations on our Remote Work page.
Live Poll
Should the city prioritize local business operations over planned infrastructure maintenance on public waterways?





